plan 0040: State after the hand staging cycle of batch

Merged johnandersen777.bsky.social asked to merge into main from socialweb.computer/socialweb-computer-kcp:phase-2
docs/plans/0040-release-pipeline.md+16−7
@@ -3,7 +3,7 @@
Status: the only plan in flight (owner, 2026-11-17); docs/plans/0001-0039 and NEXT.yaml are history. How to run, hold
and debug CI by hand: `docs/ci-debug.md`. The state before this work: main e39097c2 (2026-11-12).
State (2026-11-20 03:30Z; updated by the lead):
State (2026-11-20 06:40Z; updated by the lead):
- Main: CI in series on four home bidders (decision 43), the fixes of promote 11's cycle, the kcp docs, the site
from the repo (`site/`), the protocol docs.
@@ -35,12 +35,21 @@ State (2026-11-20 03:30Z; updated by the lead):
- `rc-writes` (decision 67): review fixes proven with a PDS fault proxy at 0e9c128c, delta review running; the
OAuth scope in work. `rc-pins`: rebase onto series CI and a clean run of 0007:upgrade (staging 44) in work.
- `docs-assoc`: in the batch (decision 62). `do-bidder`: paused until after roll two (decision 68).
- Branch `batch` on `swc` (610afcfe) = main + `ci-no-john` + `lexicons-fix` + `cli-args` + `rc-writes` c658a27a
+ `relay-fix` + `relay-ws-503` + `rc-reads` 7831de98, each after its review. Hand staging cycle on fc9c4dce
(stg-859542): 18 of 43 done at 04:59Z, 17 PASS, 1 FAIL (0001:s2: its own bidder install timed out fetching the
1.44 GiB guest image; root cause in work).
- Reviewed, fixes in work before merging: `secrets` (transport and path rule; `secrets-on-batch`), `route-trust`
(SAFE with fixes), `rc-cap` (redesign built and proven; review running).
- Branch `batch` on `swc` = main + `ci-no-john` + `lexicons-fix` + `cli-args` + `rc-writes` (ingress retry, the
OAuth scope for requester and bidder) + `relay-fix` + `relay-ws-503` + `rc-reads` 7831de98 + `fix-0001s2` +
`fix-0015`, each after its review.
- Hand staging cycle of `batch` at fc9c4dce (stg-859542, 03:36Z-05:57Z): gate: staging: 40 of 43 PASS. FAILs,
each root-caused, fixed on `batch` and passing on the held network with the fix: 0001:s2 and 0020:run (their
own `install bidder` had the 3 min default network timeout for the 1.44 GiB guest image on the home uplink;
now 20m as the stand-up), 0015:pressure (test timing: crossing 2 was scheduled from record 1, 0-15 s before
the bidder could re-arm; now from crossing 1's restore). Summary: `~/.tmp/batch-cycle/status.md`.
- Not yet in `batch`, each in its last fix round after review: `secrets` (iroh and WebRTC, path rule), `rc-cap`
(redesign, decision 73), `route-trust` (decisions 66, 71), `rc-reads` item 8 (a failed trust lookup is not a
deny), `rc-pins` (redesigned: one landing, no schema; staging proof owed; staging 44, with secrets 45).
- Then: totals reconciled, one full hand staging cycle of the final `batch` with other agents paused, the hand
prod entries, one pull.
- Relay (deployed by hand, not in the pipeline): 97bba4a7 then e7251bbc on xrpc.fedproxy.com; takeover refused on
the live relay with throwaway identities; requests fell from about 290/s to under 1/s.
- Landed without CI (docs, site): the site from `site/` with `/install.sh`, white pages, build-time highlighting,
the lexicon and XRPC reference, lexicon tables and glossary generated from `lexicons/`; the flow map; plan 0053
(rename to `computer.socialweb.*` and `goat lex publish`, after Done when; decision 59).
.plans.yaml+1−1
@@ -31,4 +31,4 @@ plans:
log: "bash scripts/check-docs.sh"
waits_on: "the two rolls"
status: "steps 0-5 done (promote asked-only; promote.sh --dry-run rehearsed on the release image on main de0b91ee; hand builds to local/, rehearsed: publish+verify local/de0b91ee, ci-staging-binary local:); prod on rc174; no stable"
next: "03:30Z 2026-11-20: no CI cycle since promote 12 (a7dab399, red). One batch for roll one (decision 56), run by hand before its pull (51): rc-reads (proofs running), ci-no-john (ready), secrets and cli-args (both sent back by review, in rework; secrets then moves getSecrets onto iroh/WebRTC, decision 61), lexicons-fix (in work); rc-cap, rc-pins, rc-writes if reviewed in time. Before the roll: prod bidders off the `-- --atproto-oauth-qr` drop-in. Roll two = CLI help text only. State block in the plan."
next: "06:40Z 2026-11-20: no CI cycle since promote 12. Branch batch (13 reviewed pieces) had a hand staging cycle at fc9c4dce: 40 of 43, the 3 FAILs root-caused, fixed and passing on the held network. Still to merge after their last fix round: secrets, rc-cap, route-trust, rc-reads item 8, rc-pins (staging proof). Then totals (staging 45, prod 31), a full hand staging cycle of the final batch, hand prod entries, one pull, roll one; roll two = CLI help text only. State block in the plan."