0
0
plan 0040: State: batch complete, final hand cycle running
docs/plans/0040-release-pipeline.md+10−6
| @@ -3,7 +3,7 @@ | ||
Status: the only plan in flight (owner, 2026-11-17); docs/plans/0001-0039 and NEXT.yaml are history. How to run, hold | ||
and debug CI by hand: `docs/ci-debug.md`. The state before this work: main e39097c2 (2026-11-12). | ||
| ||
State (2026-11-20 06:40Z; updated by the lead): | ||
State (2026-11-20 08:00Z; updated by the lead): | ||
| ||
- Main: CI in series on four home bidders (decision 43), the fixes of promote 11's cycle, the kcp docs, the site | ||
from the repo (`site/`), the protocol docs. | ||
| @@ -43,11 +43,15 @@ State (2026-11-20 06:40Z; updated by the lead): | ||
own `install bidder` had the 3 min default network timeout for the 1.44 GiB guest image on the home uplink; | ||
now 20m as the stand-up), 0015:pressure (test timing: crossing 2 was scheduled from record 1, 0-15 s before | ||
the bidder could re-arm; now from crossing 1's restore). Summary: `~/.tmp/batch-cycle/status.md`. | ||
- Not yet in `batch`, each in its last fix round after review: `secrets` (iroh and WebRTC, path rule), `rc-cap` | ||
(redesign, decision 73), `route-trust` (decisions 66, 71), `rc-reads` item 8 (a failed trust lookup is not a | ||
deny), `rc-pins` (redesigned: one landing, no schema; staging proof owed; staging 44, with secrets 45). | ||
- Then: totals reconciled, one full hand staging cycle of the final `batch` with other agents paused, the hand | ||
prod entries, one pull. | ||
- `batch` is COMPLETE at e4ccd291 (contains main): also `secrets` (getSecrets over iroh and WebRTC, the path rule, | ||
entry 0007:webrtc), `rc-reads` item 8 (a failed trust lookup is not a deny), `rc-pins` (a self-updated bidder | ||
serves kept previous binaries; entry 0007:upgrade), `route-trust` (bids from the bidder's repo, record bytes | ||
checked against the CID, bid and receipt signatures with a verified key binding; decisions 66, 71), `rc-cap` | ||
(the provision StateSync is the reservation; the memory admission rule of decision 73; entry 0014:memfit). | ||
Each merged after its review passed; `deploy/check.sh --fast` and the policy spec tests pass on the merges. | ||
Entries now: staging 46, prod 31 (Done when on `batch` follows the list). | ||
- Now: the final full hand staging cycle of `batch` (`~/.tmp/final-cycle/status.md`); then the hand prod entries; | ||
then one pull; roll one; roll two = CLI help text only. | ||
- Relay (deployed by hand, not in the pipeline): 97bba4a7 then e7251bbc on xrpc.fedproxy.com; takeover refused on | ||
the live relay with throwaway identities; requests fell from about 290/s to under 1/s. | ||
- Landed without CI (docs, site): the site from `site/` with `/install.sh`, white pages, build-time highlighting, | ||
.plans.yaml+1−1
| @@ -31,4 +31,4 @@ plans: | ||
log: "bash scripts/check-docs.sh" | ||
waits_on: "the two rolls" | ||
status: "steps 0-5 done (promote asked-only; promote.sh --dry-run rehearsed on the release image on main de0b91ee; hand builds to local/, rehearsed: publish+verify local/de0b91ee, ci-staging-binary local:); prod on rc174; no stable" | ||
next: "06:40Z 2026-11-20: no CI cycle since promote 12. Branch batch (13 reviewed pieces) had a hand staging cycle at fc9c4dce: 40 of 43, the 3 FAILs root-caused, fixed and passing on the held network. Still to merge after their last fix round: secrets, rc-cap, route-trust, rc-reads item 8, rc-pins (staging proof). Then totals (staging 45, prod 31), a full hand staging cycle of the final batch, hand prod entries, one pull, roll one; roll two = CLI help text only. State block in the plan." | ||
next: "08:00Z 2026-11-20: branch batch is complete at e4ccd291 (18 reviewed pieces; entries staging 46, prod 31; Done when updated on batch). Running: the final full hand staging cycle of batch (~/.tmp/final-cycle/status.md). Then the hand prod entries, one pull, roll one; roll two = CLI help text only. Not in the batch: the DigitalOcean bidder (decision 68), fast-standup (decision 63)." | ||